AI data centre operatorSINGAPORE · 1.35°N 103.82°E

AI data centres,from land and powerto long-term operation.

Headquartered in Singapore, we take an AI data centre through its whole life: land and power, the M&E supply chain, construction, and long-term operations.

Layers in the value chain
10
Layers we run ourselves
6
Delivery gates
6
Countries in our footprint
7
Scroll

The firm

Nourra Holdings is an AI data centre operator headquartered in Singapore. We take a facility through its whole life: securing land and power, integrating the mechanical and electrical supply chain, building it, and running and maintaining it over the long term.

  1. 01Land and powerPowered buildings · land · grid connection
  2. 02M&E supply chainPower · liquid cooling · modules
  3. 03ConstructionBuilding · M&E · racking
  4. 04Operations and maintenanceOn-site teams · inspection · spares

Value chain

Ten layers sit between a unit of electricity and a single model call.

Open each layer to see what it is and where Nourra sits.

Inside the facility

An AI data centre does two things: it gets power into the rack and takes heat out.

Switch between the power and cooling paths, and select a component to read about it.

POWER PATH COOLING PATH Grid Transformer UPS Distribution CDU Heat rejection Racks
  • Power
  • Coolant supply
  • Coolant return

Density

What sets an AI data centre apart is the power in a single rack.

Drag the slider to see how rack count and cooling change for the same 1 MW of power.

40kW
Try
Racks powered by 1 MW
25
Type of facility
High-density hall
Cooling
Enhanced air or rear-door heat exchange

Ranges are typical industry values, shown for illustration. Project figures follow the design documents.

1 MW · rack layout, illustrative25 racks

Supply chain

How fast a facility gets built depends, as much as anything, on when the equipment arrives.

We procure and deliver power distribution, liquid cooling and prefabricated modules as one package.

  • Power equipment
  • Liquid cooling
  • Prefab modules
One packageProcure · integrate · deliver

Business

Six lines of business cover every stage of a facility, from site to operation.

  • Site and power

    We source powered buildings and developable land, and check zoning, floor loading, power capacity, permits and power-on dates.

    • Powered buildings
    • Land assessment
    • Grid connection
  • Development

    Mainly small and mid-sized AI data centres of a few megawatts, expandable in phases and handed over ready for hardware to be racked.

    • Building conversion
    • Modular data halls
    • High density
    • Phased expansion
  • Supply chain

    Power distribution, liquid cooling and prefabricated modules procured, integrated and delivered as one package, combining a global supply chain with local production.

    • Power equipment
    • Liquid cooling
    • Prefabricated modules
    • Spare parts
  • Engineering

    Our own crews deliver electrical and low-voltage works, cabling, racking and facility conversion, and join larger projects as a specialist subcontractor.

    • Electrical and low-voltage
    • Cabling and racking
    • Specialist subcontracting
  • Operations and maintenance

    On-site teams run day-to-day operations, inspections and fault response, and handle scheduled servicing, repair and spare parts for facility and IT equipment.

    • On-site staffing
    • Inspection and fault response
    • Scheduled servicing
    • Repair and spares
  • Compute

    Verified GPU capacity and enterprise cloud for our partners, deployed in our own facilities.

    • GPU capacity
    • Server procurement
    • Enterprise cloud

Footprint

Based in Singapore, connected across Asia-Pacific, North America and Europe.

Headquarters
1
Project countries
2
Partner countries
4

Lines show business links from our Singapore headquarters, not physical network routes. Markers sit on capitals or major cities.

Southeast Asia, enlarged98°E–110°E

Headquarters

Data centre projects

Partner network

Delivery

A cluster passes six gates between site selection and go-live.

  1. Gate 1

    Site and power

    Confirm land use, floor loading, ceiling height and available power. Until power is secured, nothing after it stands.

    Nourra’s partSite survey, and checks on power capacity, permits and power-on dates.

  2. Gate 2

    Design and approvals

    Fix rack density, the power architecture and the cooling scheme, then complete drawings and approvals.

    Nourra’s partWe organise design and coordinate approvals.

  3. Gate 3

    Building and M&E

    Structural strengthening, transformers and switchgear, uninterruptible power, cooling pipework and fire protection.

    Nourra’s partBuilt by our own engineering crews and accepted at milestones.

  4. Gate 4

    Arrival and racking

    Servers, network equipment and full-rack systems arrive on site to be unpacked, racked, cabled and powered.

    Nourra’s partWe verify supply and arrival dates. Our own crews rack and cable.

  5. Gate 5

    Commissioning

    Network connectivity, full-load running and thermal validation. Problems found here cost far less than problems found after go-live.

    Nourra’s partWe commission alongside specialist engineers and issue test records.

  6. Gate 6

    Handover and operations

    The cluster is handed to its user and enters long-term operation.

    Nourra’s partOur on-site team operates it against a service level agreement.

Principles

Three principles we work by.

  • End to end

    From site selection to maintenance, the critical work is done by our own people. Responsibility stays in one place.

  • Compliance

    All business follows applicable export control and sanctions law. We confirm end user, location and use before we proceed.

  • Long-term partners

    We work with a limited number of partners over the long term, on written terms.